Principle

Home/SERVICE & SUPPORT/Principle

Solenoid valve working principle

INSTALLATIONINSTRUCTIONS
1. Special attention: The pipeline must be cleaned and blown before installation to avoid impurities blocking the valve port and damagingthe sealing surface. In case of small impurities and dust, filter should be installed before the valveFilter screen 2 80 mesh).2.Pay attention that the arrow on the valve body should be in line with the flow direction of the pipe, and the coil should be installed
vertically upward and horizontally.
3. Before installation, check whether the pressure, temperature, voltage and solenoid valve nameplate and actual parameters are
consistent.
4. During installation, use a wrench to clamp the valve body and then twist the pipe must not force on the coil, so as not to make theinternal bending deformation of the solenoid valve and loose joints leading to leakage.5. Solenoid valve installation must be through the fluid action for several times, to ensure that the normal operation, can be put into
normal use.
6. Before and after the solen

2024 @ JULING Shanghai Juliang Valve Group Co.,Ltd. All rights reserved 沪ICP备05000638号-1